Search
Options:
New
Search
Site Links
Home
Page
Registered
Entity Area
Query
TSIN Database
Downloads
NERC
Help |
The table
below represents the recommended business practices for tag submission and
assessment deadlines for Interchange
Transactions whose Sink
Control Areas are within the Eastern Interconnection. The table
describes the various recommended minimum submission and assessment timing
requirements. To the extent an entity utilizes a different practice than
the one recommended in this Policy the entity shall:
·
File and have the practice accepted by
its regulator.
·
Submit an explanation to NERC of the
differences in its regulator-approved practice and Policy 3.
|
Transaction Duration
|
PSE Submit Deadline
|
Actual Tag Submission Time
|
Provider Assessment Time
|
Time to Start of Transaction
(Not Start of Ramp)
|
|
Less than 24 Hours
|
20 Minutes prior to start
|
< 1 Hour prior to start
|
£
10 Minutes from tag receipt
|
³
10 Min
|
|
> 1 to <4 hours prior to start
|
£
20 Minutes from tag receipt
|
³
40 Min
|
|
³ 4
Hours prior to start
|
£ 2
Hours from tag receipt
|
³ 2
Hours
|
|
24 Hours or longer
|
4 Hours prior to start
|
Any
|
£ 2 Hours
from tag receipt
|
³ 2 Hours
|
Below is a listing of the Standard submission times,
other entities non-standard submission times, and Comments on
submission times.
Non-Standard items and comments will be listed in red.
Actual Tag Submission Time <= 1 Hour prior to start >= 1 to <= 4 Hours prior to start >= 4 Hours prior to start Any < noon of the Day Ahead >= noon of the Day Ahead Comment Read our tariff if you want to know about our practices! Go to www.nerc.com Provider Assessment Time <= 2 Hours from tag receipt <= 10 Minutes from tag receipt <= 20 Minutes from tag receipt PSE Submit Deadline 4 Hours prior to start 20 Minutes prior to start s 5 minutes Regardless of duration, if it is for Day-Ahead, then the deadline is prior to the noon Energy Market Daily Trading Deadline, unless using PJM Non-Firm Hourly Transmission Service that is released by PJM at noon, in which case up to 30 minutes after noon. Regardless of duration,if it is for Short Notice, i.e., after the noon Energy Market Daily Trading Deadline, then the PSE Submit Deadline is 90 minutes prior to start. Time to Start of Transaction (Not Start of Ramp) >= 40 Minutes >= 2 Hours >= 10 Minutes Transaction Duration Less than 24 Hours 24 Hours or longer
|